An electric arc furnace steel processor was experiencing hydraulic cylinder failure on the segment clamp circuit. New cylinders were failing in 3-8 weeks, resulting in downtime and lost production.
IRG observed the equipment in operation and production, and provided troubleshooting of the operation, and application, revealing two inherent design flaws.
Maintenance personnel were consulted as correct operation sequence functions were determined and a course of action was determined which included:
Results:
The cylinder duty cycle now exceeds the castor segment duty cycle!