Plant scheduled manufacturing uptime was in the mid 60’s percent due to outdated, obsolete hydraulic equipment and inadequate fluid conditioning. Over the period of one year IRG repaired and/or retrofitted over forty (40) machines.
Plant scheduled manufacturing uptime increased to mid-90 percent (from mid-60 percent) and lost production time attributed to hydraulic faults was less than 1%.